Time | What is happening? |
4.00pm | Make sure all of the props are collected together ready for filming |
4.10pm | Meet Alex in Stapleford |
4.15pm | Walk to the location |
4.20pm | Set up equipment and get the actors in place ready for filming |
4.30am | Begin filming |
4.45pm | Set up in other location on the field |
5.00pm | Finish filming on the field |
5.10pm | Move locations to the canal |
5.30pm | Film on the canal |
5.45pm | Check through each shot, to make sure we have got all the shots we need |
6.00pm | Dismantle equipment |
6.15pm | Walk home with the equipment |
Friday, 18 March 2011
re-Fliming
On the 12th of march we re-film our thriller as we decided to change some of the scenes in the thriller, unfortunately i wasn’t available on the day to re-film as i had work commitments .Sophie and our actor Alex completed the filming on the Saturday .Although we had Casey Vickers who played the victim in the thriller, was unavailable on the day so Sophie took the role of the victim and she said she managed to pull of an good acting skills to achieve the high standards we were aiming for. Sophie said it was difficult but she overcome this and managed to film just her and Alex by working together, the day was a bright and warm day so the lighting was prefect for filming. The night before filming we created and schedule so Sophie and Alex knew what they were doing in the day. I am proud to say that i Sophie and Alex need an amazing job!