Friday 18 March 2011

re-Fliming

On the 12th of march we re-film our thriller as we decided to change some of the scenes in the thriller, unfortunately i wasn’t available on the day to re-film as i had work commitments .Sophie and our actor Alex completed the filming on the Saturday .Although we had Casey Vickers who played the victim in the thriller, was unavailable on the day so Sophie took the role of the victim and she said she managed to pull of an good acting skills to achieve the high standards we were aiming for. Sophie said it was difficult but she overcome this and managed to film just her and Alex by working together, the day was a bright and warm day so the lighting was prefect for filming. The night before filming we created and schedule so Sophie and Alex knew what they were doing in the day. I am proud to say that i Sophie and Alex need an amazing job!






Time
What is happening?
4.00pm
Make sure all of the props are collected together ready for filming 
4.10pm
Meet Alex in Stapleford
4.15pm
Walk to the location
4.20pm
Set up equipment and get the actors in place ready for filming
4.30am
Begin filming
4.45pm
Set up in other location on the field
5.00pm
Finish filming on the field
5.10pm
Move locations to the canal
5.30pm
Film on the canal
5.45pm
Check through each shot, to make sure we have got all the shots we need
6.00pm
Dismantle equipment
6.15pm
Walk home with the equipment