Friday 4 March 2011

Time Table

Time
What is happening?
10am
Make sure all of the props are collected together ready for filming tomorrow
10 .30am
Meet Sophie Casey and Alex in Stapleford
11 .00am
Walk to the location
11 .15am
Set up equipment and get the actors in place ready for filming
11 .30am
Begin filming
12 .00pm
Set up in other location, on the bridge
12 .30pm
Finish filming on the bridge
1 .00pm
Move locations to the canal
1 .30pm
Film on the canal
2 .00pm
Check through each shot, to make sure we have got all the shots we need
2 .30pm
Dismantle equipment
2 .45pm
Walk home with the equipment

On the day of filming we thought it would be appropriate to create a timetable for filming so we are organized and know what we were doing during filming and also saving time. Also it gave use guidance and helped us to stick to timing.   